Team

Our team is comprised of mixed expertise and knowledge which were used effectively to complete this task within the limited time frame.

Brief description of tasks executed are as listed below.


CPM Tasks

MUHANNAD ALSHEHRI
•    Health And Safety 
•    Risk Register

•    Quality Assurance 

CAROLINE CHERIAN

•    Web Design 
•    Innovation

•    Flood Defences

•    Communication, Cooperation and Collaboration with all teams

ANOOP CHINGAN BHATTATHIRI
•    CPM Lead 

•    Super Structure 
•    Building Envelope 
•    Collaborating with 3D design 

•    Communication and Collaboration within CPM team
CHANDANA KOLA
•    Sustainability 
VANESSA OMOJOLA
•    CPM Planner 
•    Site Layouts 
•    Site phasing 
•    Site Program 
•    Flood management plan

•    Communication and Collaboration within CPM team

ROJIN SAYADIAN

•    3D design 
•    Building Envelope 
•    Collaborating with Sustainability Section
•    Collaborating with Innovation Section
LIVIN XAVIER
•    Substructure 

 

QS Tasks

 

JOSHUA HAMER

·        There must be an acceptable level of transparency in the selection of the most suitable procurement and tendering strategy

·       A full and rigorous analysis of the risks associated with the route selected, taking into account the geographical location of the development

 

JAMES ALLEN

·        A review of the standard forms of contracts available, and the contractual arrangements of the parties involved

·       Advice on an appropriate tendering procedure and explanation of the tender documentation that is to be exchanged between the parties.

 

HONGYANG ZHANG

·        Explanation of the process of vetting and reporting on the tenders returned

·       The development must demonstrate potential future expansion, with consideration made to the long-term development plan of the client.

·       Suggest techniques/methods that may be used (along with a timeline of when these techniques should be adopted) to assess the services installations to the project

 

Josh & James collaborative working

 

·        Provide a detailed budget cost for the proposed scheme

·        Provide the cost information in a format that is appropriate to this type of project to be used by colleagues in your group producing the development appraisal.

·        Reveal the source(s) of your cost information and give your rationale in choosing that source, along with details of adjustments made to justify its use on this project

·        Provide a cash flow forecast for the construction phase

·        Provide a cash flow forecast for the development overall

·       Tie in your cash flow with the construction programme and the development appraisal figures.

​

BS Tasks

JOHN GARNER-  I conducted an full external and internal inspection of the site and produced a building condition survey report.

​

RE Tasks

LEWIS BARLOW

​